特斯拉美国市场已3次降价|91香蕉视频在线看|唯有相思无尽处|麻豆AV久久AV盛宴AV|国语版韩剧电视剧|谁有快播网站|多玩魔兽数据库

Shanxi Meijia Mining - Stacker Crane Stereoscopic Warehouse

The main task of this project is to store components for tunnel boring machine assembly and provide macro-level material dispatch services. The types of parts stored mainly include covers, oil pumps, standard parts, electrical parts, and other components required for tunnel boring machine assembly.

 

Scheme Configuration
2

Stacker Crane

2

Undercover AGV

1

Conveyor System

1

WMS System

1500x1500

Steel Pallet

3100x1600

Steel Pallet

Customer Pain Points

Flat stack of goods

Low space utilization

Manual picking is inefficient and physically demanding

Project Effectiveness

Stacker crane three-dimensional warehouse realizes fully automatic access and improves picking efficiency

Stereoscopic dense storage, fully utilizing high-level space

WMS enables intelligent management of the entire process from goods receipt, location, inventory, to goods issue

Related Cases